ヤエス FT-900送信改造法教えてください nasa72gx2 2001/05/08 22:43:06 └全て出来ます。 マニラ 2001/05/09 06:22:13 └各局さん今晩は。 FT900@変なおじさん 2001/05/09 21:38:10 └私もFT900手に入れたのですが送信改造... バカボン 2001/05/12 14:24:59 └ImportantNoticeRegardingDisclosureRestri... 毒キノコ(セラミック) 2001/05/12 22:19:44
Re: 私もFT900手に入れたのですが送信改造... [返事を書く] | ||
Important Notice Regarding Disclosure Restrictions This information is autorized for distribution only to individuals who are members of the U.S. Military Affiliate Radio System, Civil Air Patrol, or other government services specifically permitted by the FCC to use non-type accepted equipment such as that Remove the two screws from the top cover, and the two screws from the top rear area of the rear panel, so as to allow the top cover/heat sink to be slid slightly toward the rear. The objective is to be able to see into the CNTL-1 Unit, which is the i Locate test points TP3001 and TP3002 on the CNTL Unit. They are located near the top edge of the board, in the center from left to right. With the transceiver still turned off, connect a jumper (alligator clip is ok) between these 2 test points. Hold in the following 4 buttons: [PROC], [ATT], [IPO], and [NB]. While holding them in, turn the transceiver on. Release the buttons. The display will indicate OFF. Turn the VFO dial slowly until the display reads ON. Press the [PROC] button to write the new instructions to EEPROM. Remove the jumper across the test points. Replace the case screws. Mod is now complete.rea of the rear panel, so as to allow the top cover/heat sink to be slid slightly toward the re | ||
|
[新!各種無線機改造情報掲示板]
[EXIT]
新規発言を反映させるにはブラウザの更新ボタンを押してください。